ICP-RL: Identifying Critical Paths for Fault Diagnosis Using Reinforcement Learning
- Electrical and Electronic Engineering
- Computer Graphics and Computer-Aided Design
- Computer Science Applications
Need a simple solution for managing your BibTeX entries? Explore CiteDrive!
- Web-based, modern reference management
- Collaborate and share with fellow researchers
- Integration with Overleaf
- Comprehensive BibTeX/BibLaTeX support
- Save articles and websites directly from your browser
- Search for new articles from a database of tens of millions of references
More from our Archive
- DOI: 10.3390/en16155682 2023
Summary of Health-State Estimation of Lithium-Ion Batteries Based on Electrochemical Impedance Spectroscopy
Xinwei Sun, Yang Zhang, Yongcheng Zhang, Licheng Wang, Kai Wang
- DOI: 10.3390/en16155809 2023
Review of Family-Level Short-Term Load Forecasting and Its Application in Household Energy Management System
Ping Ma, Shuhui Cui, Mingshuai Chen, Shengzhe Zhou, Kai Wang
- DOI: 10.3390/s23156949 2023
Visual Intelligence in Precision Agriculture: Exploring Plant Disease Detection via Efficient Vision Transformers
Sana Parez, Naqqash Dilshad, Norah Saleh Alghamdi, Turki M. Alanazi, Jong Weon Lee
- DOI: 10.3390/s23156762 2023
HealthLock: Blockchain-Based Privacy Preservation Using Homomorphic Encryption in Internet of Things Healthcare Applications
Aitizaz Ali, Bander Ali Saleh Al-rimy, Faisal S. Alsubaei, Abdulwahab Ali Almazroi, Abdulaleem Ali Almazroi
- DOI: 10.3390/machines11080774 2023
Sustainable Crop Protection via Robotics and Artificial Intelligence Solutions
Vasiliki Balaska, Zoe Adamidou, Zisis Vryzas, Antonios Gasteratos
- DOI: 10.3390/mi14071480 2023
A Review of the Residual Stress Generation in Metal Additive Manufacturing: Analysis of Cause, Measurement, Effects, and Prevention
Nabin Bastola, Muhammad P. Jahan, Nithin Rangasamy, Chandra Sekhar Rakurty
- DOI: 10.3390/electronics12143155 2023
In-Memory Computing Integrated Structure Circuit Based on Nonvolatile Flash Memory Unit
Peilong Xu, Dan Lan, Fengyun Wang, Incheol Shin
- DOI: 10.3390/s23146507 2023
CNN-CNN: Dual Convolutional Neural Network Approach for Feature Selection and Attack Detection on Internet of Things Networks
Basim Alabsi, Mohammed Anbar, Shaza Rihan
- DOI: 10.1039/d3mh00882g 2023
Defect-stabilized and oxygen-coordinated iron single-atom sites facilitate hydrogen peroxide electrosynthesis
Taotao Gao, Lu Qiu, Minghao Xie, Zhaoyu Jin, Panpan Li, Guihua Yu
- DOI: 10.3390/electronics12153300 2023
Anomaly Detection in 6G Networks Using Machine Learning Methods
Mamoon M. Saeed, Rashid A. Saeed, Maha Abdelhaq, Raed Alsaqour, Mohammad Kamrul Hasan, Rania A. Mokhtar