The Impacts of the Construction of the Pillar Point Harbor Breakwaters on the Half Moon Bay Shoreline, San Mateo County, California
Gary B. GriggsTwo breakwaters were constructed between 1959 and 1961 by the U.S. Army Corps of Engineers to form a harbor within Half Moon Bay on the central California coast. Prior to construction, the bay had a smooth hook-shaped or spiral form with a shoreline in equilibrium with waves refracted around a resistant point. Following breakwater completion, wave energy that had previously been dissipated along the equilibrium shoreline of the bay was concentrated at the downcoast end of the breakwater against the low weak bluffs. The original very low (~8 cm/year) bluff recession rates increased rapidly to as much as 2 m/year which led to the destruction of a county road and wastewater transmission line and began to threaten a state highway and a group of homes. Bluff erosion has progressed as far as 1.4 km downcoast which has led to rock revetment placement to protect the highway and homes. Breakwater planning also underestimated the potential for waves to enter the gap between the two breakwaters, so a dogleg extension had to be constructed. This also failed to reduce wave action, which led to the construction of an additional set of breakwaters within the harbor to protect moored boats.