Optimal Operation of Gas Turbine Generator and Energy Storage for Islanded Microgrid AI Data Centers Under Workload Dynamics
Hyeonseong Mun, Damjan Zechevikj, Surya Santoso, Lei JiangThe rapid growth of artificial intelligence (AI) data centers introduces highly variable and mission-critical load profiles that challenge conventional power supply strategies. This paper proposes an islanded microgrid gas turbine generator (GTG) and long-duration energy storage (LDES) hybrid architecture to provide both short-term load balancing and extended energy support under prolonged outage conditions. A probabilistic multi-phase workload model is developed to capture the temporal characteristics of training, fine-tuning, and inference processes, incorporating both high-frequency fluctuations and multi-day workload variations. Based on reliability requirements, an LDES sizing methodology is formulated to ensure long-duration autonomy for mission-critical operation in a 12 MW power-block AI data center system, with the storage capacity determined based on a 12-h autonomy criterion. The GTG operating point is then evaluated using four storage performance metrics: charge/discharge transition frequency, charging time ratio, state-of-charge (SoC) deviation, and cumulative energy movement. The results indicate that the optimal GTG operating point ranges from approximately 40–73.3% of the initially selected rating, closely tracking the time-varying average load and significantly reducing LDES utilization and storage stress. While GTG fixed-output operation may induce SoC drift under sustained workload variations, applying the identified optimal operating point maintains SoC within the desired range, demonstrating stable LDES operation without dynamic adjustment. The proposed framework provides quantitative design and operational guidelines for GTG–LDES hybrid systems in next-generation AI data centers.