Implementation of a Full-Scale Hybrid System for Rainwater Harvesting and Greywater Reuse to Reduce Water Consumption and Minimize Wastewater
Jawer David Acuña-Bedoya, Edwin Alexis Fariz-Salinas, Miguel Ángel López ZavalaImplementation of real-scale systems for rainwater harvesting, treatment and reuse of greywater in residential areas is challenging because several factors should be considered for full adoption and satisfaction of decision-makers, urban developers and users. Technological, construction, operational, social (acceptance), impact on water resources, regulatory, and economic factors are involved. This study presents the implementation of a full-scale hybrid system for rainwater harvesting, treatment and reuse of greywater in a residential building located in Monterrey, Nuevo León, Mexico. The study included intervening in the hydraulic infrastructure of an already constructed residential building for collecting greywater, harvesting and collecting rainwater, designing and constructing an 80 m2 controlled natural soil treatment system (CNSTS) and a 65 m3 storage tank for treating and storing rain and greywater. Furthermore, the full-scale hybrid system was monitored under real operating conditions for a two-month period to assess its performance. Results showed that the CNSTS has the potential to replace up to 2835 m3 year−1 of potable water, equivalent to 65% of the building’s annual water consumption. The CNSTS achieved removal efficiencies of up to ~90% for Chemical Oxygen Demand, 90% for surfactants, and 50% for total nitrogen. Most of the measured parameters complied with the corresponding limits established by the Mexican standards NOM-003-SEMARNAT-1997 for non-potable water reuse, NOM-001-SEMARNAT-2021 for wastewater discharges, and NOM-127-SSA1-2021 for potable water with the exception of methylene blue active substances (surfactants), which exceeded the permissible limit during the initial monitoring stage, highlighting the need for further optimization of the system’s vegetative cover. Based on these findings, conceptual designs and preliminary evaluations were conducted for additional buildings, resulting in potable water substitution rates above 90% with investment payback periods of 2 to 5 years, depending on the water demand and the water catchment potential.