High-Precision Insulation Monitoring-Driven Intelligent Fault Line Selection Method for Photovoltaic DC Grounding Faults
Binyao Lu, Xiangning LinCurrently, insulation faults in the DC system of photovoltaic (PV) power stations are handled by a full shutdown strategy of inverters, and fault branch localization relies on manual inspection, resulting in low efficiency and poor accuracy, leading to prolonged unplanned outages and substantial power generation losses. This paper proposes an integrated solution combining high-precision insulation monitoring and intelligent fault line selection, which ensures the reliability of line selection criteria through improved measurement accuracy and achieves automatic fault isolation via optimized line selection strategies. The paper analyzes the mathematical essence of the ill-conditioned measurement equations of the traditional bridge method under severe single-pole grounding faults, establishes a dual-channel heteroscedastic noise model, and utilizes the inherent physical constraint that the sum of the positive and negative pole-to-ground voltages always equals the bus voltage to transform the ill-posed inverse problem into an equality-constrained optimal estimation problem, deriving an analytical solution in the sense of constrained least squares. A collaborative monitoring strategy of “balanced bridge monitoring first, unbalanced bridge precision measurement afterward” is proposed. An automatic fault line selection and isolation algorithm based on sequential branch switching is designed, which leverages the operational characteristic that PV systems allow short-term branch interruption, enabling automatic identification and isolation of faulty branches and automatic restoration of non-faulty branches without installing any leakage current sensors. Experimental results show that under severe fault conditions with a single-pole insulation resistance as low as 22 kΩ, the proposed method limits the error to within 5%; the proposed line selection strategy can complete identification and isolation of all faulty branches within at most two rounds of switching.