DOI: 10.3390/jmse14151428 ISSN: 2077-1312

Experimental Validation and Load-Supply Feasibility Assessment of a Battery-Coupled Wind–Photovoltaic Auxiliary Power System for a Small Marine Vessel

Ciprian Popa, Florențiu Deliu, Iancu Ciocioi, Andrei Darius Deliu, Petrică Popov, Adelina Rodica Bordianu, Adrian Popa, Narcis Octavian Volintiru, Doru Coșofreț, Gheorghe Samoilescu

This study develops and experimentally validates a battery-coupled wind–photovoltaic power model for auxiliary electrical supply in small-vessel systems. The prototype integrates a 395 W CS6R-395MS monocrystalline photovoltaic module (CSI Solar Co., Ltd., Suzhou, Jiangsu, China), a 200 W FA200W horizontal-axis wind turbine (VEVOR, Rancho Cucamonga, CA, USA), maximum power point tracking (MPPT) power-conditioning stages, a 24 V/28 Ah AGM VRLA battery bank composed of four BAT212120086 batteries (Victron Energy B.V., Almere, The Netherlands), a 24 V DC bus, and a Phoenix 24/500 pure sine-wave inverter (Victron Energy B.V., Almere, The Netherlands), targeting non-propulsion navigation, communication, and lighting loads on a 5.7 m length overall (LOA) vessel. Field-acquired irradiance, cell temperature, incidence angle, PV voltage, wind speed, and rotor-speed data were used as time-dependent model inputs and compared with synchronized active-power measurements. Across the full 15–24 September 2025 experimental campaign, the maximum absolute relative error remained below 2.69%, while the aggregate statistical validation indices were ME = −0.1041 W, MAE = 0.3988 W, RMSE = 0.4931 W, and MAPE = 0.5946%. For the representative cloud-adverse case study conducted on 21 September 2025, the measured hybrid generation reached Ehyb=611.3 Wh over 8.28 h, corresponding to CRES=102.1% of the selected Eload=599 Wh/day auxiliary-load profile and to Chyb+bat=158.1% when the usable battery reserve at 50% depth of discharge (DOD) was included.

More from our Archive