A Hybrid LSTM–Weibull Framework for Estimating Phenolic Joint Seal Replacement Needs in the Generating Units of the Santo Antônio Hydropower Plant
João Alisson Mendes Reis, Vinícius Teixeira de Freitas Conceição, Vinícius Ferreira Vidal, Lucas Dias Hudson, Pedro Paulo Dominguete Carvalho, Leonardo Mello Honório, André Luís Marques MarcatoLong maintenance outages require advance planning. This article presents a sequential hybrid framework for the paired phenolic joint seals of 50 generating units at the Santo Antônio Hydropower Plant, Brazil. A unit-specific long short-term memory (LSTM) model estimates the time to recorded replacement and supplies the horizon for Monte Carlo propagation using length-indexed Weibull wear models. An empirical hazard yields seal-specific outputs. Their maximum provides a signaling index based on the logical OR rule, under which either seal can trigger a signal, rather than an exact calibrated joint probability. The main historical configuration uses seven inputs, including gross head, on a 10-day grid. The corresponding archive contains 8858 forecasts across 89 of 100 selected cycles, with a pooled timing mean absolute error (MAE) of 33.58 days and disjoint network-training and validation records. Replacing arithmetic averaging with the maximum raises the mean index from 90.526% to 94.230%. A known-horizon check and a latent-wear sensitivity analysis are reported separately. A chronological calendar experiment uses fitted models held fixed during evaluation, separate development data, and a later test period containing 29 replacements. At the 90% cutoff, false-positive rates are 48.57% and 47.43% for descriptive action windows of 100 and 200 days. Precision is 8.84% and 16.89%. Higher cutoffs reduce false positives but can reduce event-warning coverage. A supervised joint-event probability extension improves Brier loss relative to a constant-risk reference while overestimating mean event risk. The results demonstrate a coupling of temporal prediction and stochastic condition projection, but do not establish an optimal cutoff, satisfactory probability calibration, or prospective operational effectiveness.